Accelerated bridge construction meets accelerated mobility.

Keeping Florida moving—faster and safer.

When the Florida Department of Transportation (FDOT) launched the ambitious ABC Acceler8 program—a major initiative to replace eight aging bridges in record time—the challenge was clear: maintain traffic flow and public safety while executing rapid construction in a high-volume corridor.

Enter The Road Zipper System.

By integrating moveable barrier technology into the traffic management plan, FDOT ensured peak-direction mobility and continuous access—without adding lanes or increasing footprint. The Road Zipper™ helped transform what could have been years of congestion into a showcase of smart, efficient infrastructure delivery.