Minimizing congestion. Maximizing safety.

Using a moveable barrier to keep Milwaukee moving during major bridge rehabilitation.

When the Wisconsin Department of Transportation (WisDOT) began the $278 million I-794 Lake Freeway project, they faced a challenge: how to replace the deteriorating deck and retrofit the aging Daniel Hoan Bridge without bringing traffic in and out of Milwaukee to a standstill.

Their solution? The Road Zipper System™—a moveable barrier that allowed WisDOT and Walsh Construction to reconfigure traffic flow in real time, maintaining two lanes in the peak direction while one bridge span was under construction.